BizNavi HubSign in

PLD 2026 transition planner

Product liability transition readiness

Follow inventory, dates, roles, software, evidence, and a national-law check.

Saved answers stay inside these labels: kind_band, service_band, commercial_band, foss_band, movement_band, timing_band, role_band, base_band, found_band, soft_band, update_band, learn_band, integrate_band, safety_band, modified_band, control_band, purpose_band, hazard_band, risk_band, foresaw_band, version_band, design_band, change_band, test_band, defect_band, file_band, trace_band, keep_band, owner_band, handling_band, stock_band, date_band, map_band, digital_band, evidence_band, nation_band, plan_band

What this checks

The planner uses two approved dates only. Member States transpose Directive (EU) 2024/2853 by 2026-12-09. The new framework is for products placed on the market or put into service after 2026-12-08. The workflow is inventory, date classification, operator role, software and modification review, evidence readiness, then a national transposition check. If national law is not verified, the result is a national-law check. No Member State date is invented.

Who should use this

Programme owners coordinating the product liability transition across product families.

How results work

On track needs every step, including a completed national check. A missing record is an evidence gap. A missing plan is an action. An unknown step is a specialist review.

Dates used in this screen

Member States must transpose Directive (EU) 2024/2853 by 2026-12-09. The new liability framework is for products placed on the market or put into service after 2026-12-08. Earlier products remain with the previous framework. National transposition is not filled in here.

Official sources

Use the current text of Directive (EU) 2024/2853, the 2026 corrigendum, the Commission pages on defective-product liability, and national transposition information when it is published. The older product liability directive remains the prior framework.

Limitations

Do not read 2026-12-09 as the placing boundary. That deadline is transposition. The scope boundary remains the day before.

How to read the screen

Start with known facts

Classify each product family against the two approved dates before you assign roles.

Leave gaps open

Send software, AI, and later modifications to their own checkers instead of folding them into this plan.

Readiness is not a judgment

Leave the national step open until a published implementing rule is actually checked.

Questions

Which dates appear?

Only 2026-12-09 for transposition and 2026-12-08 as the scope boundary. The uncorrected journal text that said after 2026-12-09 is not used as the placing date.

What if a Member State has not published its law?

Keep the national-law check. Do not copy another country's date or infer the missing rule.

Does this store documents or names?

No. Only the selected categories and the ruleset version can be saved.

Where do national rules fit?

If implementation in a Member State matters and is not verified, the result stays a national-law check. No national date is invented.