BizNavi HubSign in

Machinery Regulation

Machinery Regulation Transition Planner

Track the path from the Directive baseline to the 2027-01-20 application date without adding other dates.

Saved bands only: kind_band, use_band, movement_band, excluded_band, timing_band, role_band, annex_band, part_band, standard_band, ready_band, accident_band, intent_band, software_band, data_band, control_band, change_band, update_band, ai_band, format_band, access_band, version_band, language_band, download_band, declaration_band, technical_band, retention_band, baseline_band, scope_band, ehsr_band, cyber_band, docs_band, assessment_band

What this checks

It records the Directive baseline, scope review, Annex I review, essential health and safety gaps, cyber and software review, documentation, conformity assessment, and declaration readiness.

Who should use it

Programme leads who need one milestone, 2027-01-20, and a bounded status.

How results work

All yes bands return on track. An evidence no returns an evidence gap. An action no, or an Annex I no, returns action required. An Annex I unknown returns specialist review. Any other unknown returns review required.

Key date

Regulation (EU) 2023/1230 applies from 2027-01-20 and replaces Directive 2006/42/EC. Products placed on the EU market before that date remain under the applicable transition rules. Results are readiness screening, not a conformity assessment.

Official sources

Use official transition guidance and the consolidated text. The planner does not invent milestone dates.

Limitations

The only milestone shown is 2027-01-20. Earlier chapter or article start dates are not added here.

How to read the planner

On track

Baseline, scope, Annex I, safety gaps, cyber, documents, assessment, and declaration are all recorded as done.

Action required

The baseline, scope, assessment, declaration, or Annex I step is recorded as not done.

Evidence gap

The safety-gap, cyber, or documentation step is recorded as not done.

Planner questions

Can I add 2027-01-14 as the application date?

No. The mandatory application date used here is 2027-01-20.

What does the Directive reference mean?

Regulation (EU) 2023/1230 replaces Directive 2006/42/EC. That fact is not a second milestone date.

Does on track mean certified?

No. The planner never says certified, CE approved, or guaranteed conformity.

What if Annex I is still unclear?

That is specialist review, not a guessed route.